RV-10 N205EN

Up one level RV-10 Construction » Construction Log » Empennage » Empennage Attach and Empennage Fairings

Empennage Attach and Empennage Fairings
Empennage Attach and Empennage Fairings. These steps weren not completed during the Quickbuild program. Empennage attach is completed. I will wait to complete the tips when I do the wing tips. The emp is now disassembled with the shop ready for delivery of the QB wings and fuselage.

2005-06-23-004 Checking to make sure the elevator has the proper amount of travel

Checking to make sure the elevator has the proper amount of travel

2005-06-24-005 Horizontal attached

Horizontal attached

2005-06-24-006 Horizontal and vertical attached

Horizontal and vertical attached

2005-07-01-022 Assembling the elevator trim bracket

Assembling the elevator trim bracket

2005-07-01-027 Static port test fit in 1/4

Static port test fit in 1/4" hole. The static port kit is from SafeAir 1

2005-07-01-026 Another picture of the SafeAir 1 static port

Another picture of the SafeAir 1 static port

2005-07-01-024 Zach helping out.  He is making sure the static port will clear the ribs.  It does.

Zach helping out. He is making sure the static port will clear the ribs. It does.

2005-07-01-002 Empennage attach complete

Empennage attach complete

2005-07-01-003

2005-07-01-006 1/4

1/4" hole for static port

2005-07-01-007 Elevators attached

Elevators attached

2005-07-01-005 Push rod to elevators

Push rod to elevators

2005-07-01-004 Push rod and bell crank

Push rod and bell crank